All comparisons
Internal engineering project
Switchpoint vs In-House Build
An engineer’s year back, and the maintenance bill stops.
$6,500
Their cost, per month
0
Contract months remaining
200
Migration hours estimated
The numbers, filled in for you.
Every input below starts from this rival’s stored figures. Change any of them and the breakeven month moves with it.
Line by line.
Feature | Switchpoint | In-House Build |
|---|---|---|
Engineers tied up in upkeep | 0 | 1 full time |
Time to first live workflow | 4 days | 2 quarters |
Evaluation before release | Built in | Whatever was written |
Rollback to a prior version | One click, any version | Depends on the branch |
Migration assistance | Included | Not applicable |
The build worked. Maintaining it cost us two engineers a year, every year.
VP engineering, Culverton Media